Drivers in and around Teignbridge will have nine National Highways road closures to watch out for this week.
But motorists will be able to take some solace in the fact that all of them are only expected to cause slight delays, of under 10 minutes.
The latest expected works list, with notes from National Highways, shows that two closures already in place are expected to carry on this week:
• A30, from 6am November 7 to 8pm December 14, slight delays (under 10 minutes): A30 both directions Fingle Glen to Alphington lane closures/contraflow and 50mph speed limit for resurfacing.
• A30, from 6am October 25 2022 to 6am February 25 2023, slight delays (under 10 minutes): A30 eastbound, Alphington entry slip lane narrowing for resurfacing.
And a further seven closures will begin over the next seven days:
• A38, from 8pm November 23 to 4am November 24, slight delays (under 10 minutes): A38 eastbound, Chudleigh to Haldon Hill lane closures for barrier repair.
• A38, from 8pm November 24 to 4am November 25, slight delays (under 10 minutes): A38 eastbound, Chudleigh to Haldon Hill lane closures for barrier repair.
• A38, from 8pm November 25 to 4am November 26, slight delays (under 10 minutes): A38 westbound, Ashburton to Dart Bridge lane closures for barrier repair.
• A30, from 7pm November 28 to 6am November 29, slight delays (under 10 minutes): A30 eastbound, Whiddon Down to Cheriton Bishop lane closure and convoy for carriageway surfacing works.
• A38, from 7pm December 5 to 6am December 7, slight delays (under 10 minutes): A38 eastbound, Marley Head to Lower Dean lane closure and convoy for carriageway surfacing works.
• A38, from 9pm December 5 to 6am December 6, slight delays (under 10 minutes): A38 eastbound, Linhay junction, Ashburton exit slip road closure for resurfacing, diversion via A38 eastbound to Goodstone and return.
National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.